Tile by tile, floor by floor — momentum is everything right now at Casa Pisces

  • Writer: Casa Pisces
    Casa Pisces
  • May 19
  • 2 min read
Aerial view of current stages of construction at Casa Pisces
Aerial view of current stages of construction at Casa Pisces

Two buildings. Two very different stages. Both moving faster than ever. Here's where things stand at Casa Pisces as we push deeper into the build.


Building 1

~88%

Building 2

~38%

Building 3

~14%

01

Building 1 — finishing touches, from the ground up



Building 1 is deep in its final chapter, and the tiling work that's been underway for weeks is now spreading to every surface that matters. The verandahs — those open, breezy spaces where guests will spend a great deal of their time — are being tiled out, and the stairs are following right behind. There is something meditative about watching a tiling crew work: one piece at a time, each one set with precision, until suddenly a floor becomes something you want to photograph.


This is the stage of a build where patience pays off most visibly. The big structural decisions were made months ago; what's happening now is the accumulation of hundreds of smaller ones — grout lines, material choices, finishes — each one nudging the overall experience of the space toward what we imagined it could be.


WHAT'S COMING NEXT FOR BUILDING 1

With tiling progressing across verandahs, bathrooms, and stairs, the final interior installations — fixtures, furniture, and fittings — are not far behind. Building 1's first guests are closer than ever.

02

Building 2 — rising fast, floor two on the horizon


If Building 1 is in its final sprint, Building 2 is in full stride. The pace of construction here has been genuinely impressive. Since our last update, the entire first floor has taken shape: the outer walls are up, the interior room-divider walls have been erected, and the bathroom walls are in the process of being finished. In just a matter of weeks, what was a freshly poured foundation has become a building with rooms you can walk into and imagine.



The next major milestone for Building 2 is the casting of the second-floor slab — a pour that will create the ceiling of the first floor and the foundation for everything above it. Once that concrete is set and cured, second-floor construction begins in earnest. We expect that transition to happen very soon.

FIRST FLOOR OUTER WALLS

Complete


ROOM DIVIDER WALLS

Complete

BATHROOM WALLS

Being finished


2ND FLOOR SLAB

Coming soon

WHAT'S COMING NEXT FOR BUILDING 2

The second-floor slab will be cast shortly, unlocking the full second phase of construction — framing, walls, and eventually the same finishing process now underway in Building 1.

Two buildings deep in construction, a third with its piles in the ground — Casa Pisces is moving on every front. We'll be back soon with the moment Building 2's second floor begins to rise. Until then, the crews are on site and the work continues.


With our recent progress, we invited our friends from TG Media out to shoot some aerial footage - and the bird's eye view really gives an idea of what an impressive project this is turning out to be. Here's a look at how we're looking now and an AI rendering of how we may be looking in the next couple of months!