Casa Pisces Ambergris Caye construction update (October 2026
It's been a few weeks since our last update, and a lot has happened across the property. Casa Pisces Ambergris Caye is moving on every front — Building 1 is as complete as a building gets before guests walk through the door, Building 2 is days from done, Building 3 is rising fast, and the pool club restaurant and bar now has a working kitchen and the glow of ambient lighting. Here is everything, all at once.
Casa Pisces
1 day ago4 min read


Casa Pisces Hotel Building 2 — Paint, Tiles & Electrical Underway in Ambergris Caye
Casa Pisces hotel Building 2 is in the thick of its finishing phase — and for the first time, all three interior workstreams are running at once. Paint, tiles, and electrical are all active simultaneously, which means this building is moving faster toward completion than any single update can quite capture. Paint on the walls. Tiles on the floors. Electrical in the ceilings 01 Building 2 — Casa Pisces hotel's second beachfront building enters its finishing phase With plasteri
Casa Pisces
Sep 252 min read


Casa Pisces Ambergris Caye Construction Update - Early September 2026
The latest Casa Pisces Ambergris Caye construction update covers four active fronts — and for the first time, one of them includes handcrafted Belizean hardwood furniture sitting on the island, ready and waiting for the last tile work to be finished before it finds its home.
Casa Pisces
Sep 43 min read


The bar is ready — and Building 2 is almost smooth
A focused update this week at Casa Pisces Ambergris Caye — two fronts, two big steps forward. The pool club bar has reached a milestone worth raising a glass to, and Building 2 is on the final stretch of its plastering before paint and tiles move in. 01 Pool club bar — finished and ready The bar at Casa Pisces is done. The hardwood bartop — stained and sealed to a rich, lasting finish — is complete. The lights are installed and casting exactly the kind of warm glow a good bar
Casa Pisces
Aug 122 min read


Furniture incoming, render drying — and bar taking shape
The latest Casa Pisces Ambergris Caye construction update is a story of finishes: a building waiting on its final pieces of furniture, another getting its smooth exterior skin, and a bar that is beginning to look exactly like the place you'll want to end your day.
Casa Pisces
Aug 33 min read


Casa Pisces Ambergris Caye Hotel Update — Building 1 Complete, Restaurant & Water System Ready
The latest Casa Pisces Ambergris Caye construction update brings our biggest news yet: Building 1 is 100% complete. Meanwhile Building 2 is racing through its exterior, the pool club is nearing full readiness, and the water system that will serve the entire property is already in the ground and working.
Casa Pisces
Jul 213 min read


Casa Pisces Ambergris Caye Construction Update — Lights, Roofs & Four Buildings in Motion
Casa Pisces Ambergris Caye is entering a new phase — one where Building 1 glows with its first installed lights, Building 2's roof is being cast overhead, and a fourth building has officially joined the construction site. Here is where everything stands.
Casa Pisces
Jul 23 min read


Beams up, pylons in — and Belizean hardwood on its way | Casa Pisces Hotel Construction Update
Building 2 is approaching its roof. Building 3 has steel and concrete in the ground. And the furniture that will fill these rooms — handcrafted right here in Belize — is packed and ready to cross the water to Ambergris Caye. This is a big update.
Casa Pisces
Jun 243 min read


Building #1 at Casa Pisces is Almost Complete!
Building 1 is now in its finishing phase, and the work happening on site has shifted to the kind of detail that only shows up this close to completion.
Casa Pisces
Jun 163 min read


Crafted from the inside out — the woodwork begins at Casa Pisces
Paint is dry, tiles are set, and now the carpenters have moved in. Building 1 is entering its most personal phase yet, while Building 2 reaches up toward its second floor. Here's where things stand.
Casa Pisces
Jun 23 min read


Doors open, roofs rise — Casa Pisces is almost ready to meet you
Doors and windows are going in, tiling is complete, and paint is going on inside and out.
Casa Pisces
May 263 min read


Tile by tile, floor by floor — momentum is everything right now at Casa Pisces
Two buildings. Two very different stages. Both moving faster than ever. Here's where things stand at Casa Pisces as we push deeper into the build.
Casa Pisces
May 192 min read


Walls going up, tiles going down — Casa Pisces is taking shape
This update is a big one. Building 1 is deep in its finishing chapter, Building 2 is rising from the ground, and Building 3 is right on its heels. Every corner of this site is alive with progress. BUILDING 1 Painting, electrical, tiling Interior finishes BUILDING 2 Foundation poured, walls rising Structural phase BUILDING 3 Piles driven, foundation next Coming soon SEPTIC SYSTEM Fully operational Complete 01 Building 1 — the inside story If Building 1's exterior was last upda
Casa Pisces
May 113 min read


Three buildings on the horizon — and everything in between
A lot has happened since our last update. Building 1 is in its final visual chapter, the infrastructure is officially behind us, and we now have not two but three buildings in motion. Here's the full picture. BUILDING 1 Exterior & finishes Final stage SEPTIC SYSTEM Commercial-grade Complete BUILDING 2 First floor rebar Ready to pour BUILDING 3 Piling underway Just started 01 Building 1 — the final visual touches We are in the home stretch with Building 1. The exterior is curr
Casa Pisces
May 42 min read


Where things stand — and where we're headed
We promised you an honest look at the build. So here it is: the first real update from the ground up at Casa Pisces. Things are moving fast, and we couldn't be more excited to share where we are.
Casa Pisces
Apr 282 min read


Building Casa Pisces, One Layer at a Time
Welcome to the official construction blog for Casa Pisces — your front-row seat to every milestone, setback, and breakthrough as we build the hotel we've always envisioned